    Getting ready to do a pole barn

    We have a nice shed on our property and I am using it to store some pallets and plywood left over from the wedding plus my trailer and 1025R implements. My SIL also stores some of his Amazon stuff in it. But it is a long way from the house (don't know what the previous owner was thinking) and has a couple of design flaws (8' wide barn doors for example - hard to get the trailer in and out). So we are going to have Pioneer Pole Barns build one for us. We are deciding between 30x30x10 and 30x40x10 and it will depend entirely on the price difference. The desire is to be able to store the trailer, the implements, the tractor, and the Suburban and still have room left for a decent sized shop.

    I'm not a fanatic DIYer like some of you guys (lack of skill), so we'll pay to have the barn built and then I will do the wiring and lighting and any other interior touches we decide on. We are in the planning stages now, so I'm thinking about leveling the area myself (good excuse for a couple more implements), and my wife is thinking about me doing the concrete floor later on. I'm not thinking about that.

    I have been doing a lot of research on the subject but would welcome any ideas/suggestions/warnings that you guys might have.

  2. Remove Advertisements
    GreenTractorTalk.com
    Advertisements
     

  3. Top | #2
    flyweight's Avatar
    Join Date
    Jun 2014
    Last Online
    Yesterday @ 03:00 PM
    Location
    Louisiana, (southeast)
    Posts
    9,370
    Thanks
    820
    Thanked 1,734 Times in 1,195 Posts
    Gonna be watching. Click image for larger version. 

Name:	binoculars-smiley.png 
Views:	347 
Size:	4.0 KB 
ID:	480866
    etcallhome, Levi, BigJim55 and 5 others like this.
    Michael

    2019 JD Z540R 54" cutting deck w/MulchControl™
    1984 JD 750
    1971 JD 15 Chainsaw ← hasn't run since ~1975

    Also have a bunch of other stuff.
    ---------------------------------------

    " If there's no one around to smell me, do I really stink"? - John Wells - Brewster County, West Texas.









  4. Top | #3

    Join Date
    Sep 2017
    Last Online
    Today @ 07:25 AM
    Location
    Front Royal, Va
    Posts
    427
    Thanks
    123
    Thanked 137 Times in 59 Posts
    Decide on what size you think you need then go up to the next size. Tis better to build the extra 10 feet now than to wish 5 years from now that you had gone bigger.
    Rudy-

    Stable includes:
    2017 x580, 54" deck with Mulcher, sleeve hitch, rear blade, box scraper, 47" Snowblower, rear mount electric spreader
    1980 IH Cub Cadet 682, 50" deck, rototiller, front blade (inherited from FIL, in middle of full restore)
    Other Toys:
    Stihl MS290 Farm Boss Chainsaw
    Stihl BG56 Blower
    Stihl KM 111 Kombisystem

  5. Remove Advertisements
    GreenTractorTalk.com
    Advertisements
     

  6. Top | #4
    ky_shawn's Avatar
    Join Date
    Sep 2016
    Last Online
    10-16-2018 @ 08:44 AM
    Location
    Bluegrass state
    Posts
    1,933
    Thanks
    176
    Thanked 270 Times in 225 Posts
    Lay out and mark a 30x30 space then place the trailer and suburban inside, those two items alone will fill up some sq footage quickly. 30x30's are a fairly common size in my area (I'm sure they are everywhere). I have seen many of them built and within a year or two lean to's suddenly appear on the sides. Trailers and implements are the items I commonly see under the lean-to so I assume those items was consuming to much interior space and folks wanted them out of the way. It's easy to spend other people's money but I'm betting the common response in this thread will be "build bigger"
    etcallhome, Levi, BigJim55 and 5 others like this.
    3520 (cab, eHydro, R1's, 300x fel, forks, grapple) Frontier 5' cutter, 7' Tufline disk, 6' Gill pulverizer, 6' box blade, 6' rear blade, TSC post auger, 6' Woods rfm, 8' JD rotary hoe, 8' Brillion cultipacker, 6' field cultivator, Tarter spreader, Fimco 3 point sprayer, subsoiler, ken's bolt on hooks & clevis, JD Z920 ZTR

  7. Top | #5
    Marlin's Avatar
    Join Date
    Sep 2014
    Last Online
    05-22-2019 @ 03:31 PM
    Location
    The Willamette Valley, Laurelwood/Gaston, Oregon
    Posts
    4,682
    Thanks
    1,960
    Thanked 746 Times in 464 Posts
    You're getting a lot of good ideas here. About a year ago I had a 26' x 32' x 12' shop built. I was constrained by space so that was it. I hadn't planned on parking my Dodge 1 ton inside at all but I like to now and will do so as long as I don't need the space for a project. I did all my own internal work except for the concrete which I would suggest you do ASAP as working on gravel is the pits. That included electrical, plumbing, heating, lighting, insulation, and wall board hanging (OSB).

    This thread documented the process and has a lot of pictures: http://www.greentractortalk.com/foru...-building.html

    I'm very happy with the building.
    etcallhome, MDrew, Levi and 6 others like this.
    Marlin

    JD 1026R - March/2013
    JD H120 NSL Loader, JD 647 Tiller, JD Ballast Box
    Frontier BB2048L Box Scraper
    IMatch, Piranha Tooth Bar
    Ken's Bolt-On Hooks & FEL Receiver Hitch
    John Deere Wheel & Suitcase Weights
    Wheel Spacers - 2" Front, 4" Rear
    Heavy Hitch Hitch’N Can
    LED Lights Front & Rear Facing
    Artillian Forks & Front Hoe
    R4 Tires Front & Rear


    
"Prayer can never be in excess." ~ C. H. Spurgeon




  8. Top | #6
    Bubber's Avatar
    Join Date
    May 2012
    Last Online
    Today @ 07:29 AM
    Location
    Georgia
    Posts
    3,580
    Thanks
    445
    Thanked 601 Times in 385 Posts
    Quote Originally Posted by drynoc View Post
    and my wife is thinking about me doing the concrete floor later on. I'm not thinking about that.
    A lot of good advice here already, go as big as your zoning, or wallet will allow. If there is a shread of thought in "me doing the concrete floor" yourself, don't. Hire that part out. If it was just having it done, carry on.
    etcallhome, Levi, BigJim55 and 6 others like this.
    2014 2032r Classic...


    -Dan

  9. Top | #7

    Join Date
    Feb 2017
    Last Online
    09-09-2019 @ 07:46 AM
    Location
    Prince William County, VA
    Posts
    195
    Thanks
    27
    Thanked 9 Times in 7 Posts

    Thanks, guys

    The price difference between the two sizes is only about $3K, so I'm going to talk the Mrs. into going with the 30x40. It will be worth it in the long run. I've finished two basements to include wiring, lighting, ducting, plumbing, drywall and paneling, so I can handle the interior. Note that I did not say anything about concrete. I have seen that done before (can't pass a construction site without stopping for a look) and have been looking at a few Youttube videos of smaller jobs, and I have decided that that is not for me.

    Next step is to nail down the price and then sign the contract, and then get the permits from Prince William County.

    Interesting side lights: the builder wants to pour the concrete after the building has been built, and will do everything except supply the stone for the base.

  10. Top | #8
    Bonehead Club Lackey Levi's Avatar
    Join Date
    Jul 2013
    Last Online
    Yesterday @ 10:39 AM
    Location
    NE Tenn.
    Posts
    10,148
    Thanks
    2,987
    Thanked 1,896 Times in 1,064 Posts
    Quote Originally Posted by drynoc View Post
    The price difference between the two sizes is only about $3K, so I'm going to talk the Mrs. into going with the 30x40. It will be worth it in the long run. I've finished two basements to include wiring, lighting, ducting, plumbing, drywall and paneling, so I can handle the interior. Note that I did not say anything about concrete. I have seen that done before (can't pass a construction site without stopping for a look) and have been looking at a few Youttube videos of smaller jobs, and I have decided that that is not for me.

    Next step is to nail down the price and then sign the contract, and then get the permits from Prince William County.

    Interesting side lights: the builder wants to pour the concrete after the building has been built, and will do everything except supply the stone for the base.
    As much as I know about concrete, the people the put down the concrete would have to do it from start to finish and that includes the stone or whatever else it needs. If they couldn't do the stone I'd be getting me a different batch of people to do all of it. That's all I know about concrete.
    etcallhome, Doug, BigJim55 and 4 others like this.
    1026R -- 60D mmm -- H120 Loader -- Curtis 150 Tiller -- DR 3 point Chipper -- Howse Middle Buster -- Brinly 16 Blade Disk -- Kodiak 5' Box Blade -- 12-42 lb. suitcase weights -- Lawn roller -- Upgraded seat springs from psrumors -- Kennyd's bolt on hooks & clevis -- BXpanded tooth bar -- CMI 6' wagon -- Heavy Hitch Cultivator /garden bedder / hiller attachments --

    Donated by some great people/vendors on here: 72 lb. wheel weights -- Bro-Tek 1˝" rear wheel spacers.
    NRA Life Member

  11. Top | #9
    Marlin's Avatar
    Join Date
    Sep 2014
    Last Online
    05-22-2019 @ 03:31 PM
    Location
    The Willamette Valley, Laurelwood/Gaston, Oregon
    Posts
    4,682
    Thanks
    1,960
    Thanked 746 Times in 464 Posts
    Quote Originally Posted by Levi View Post
    As much as I know about concrete, the people the put down the concrete would have to do it from start to finish and that includes the stone or whatever else it needs. If they couldn't do the stone I'd be getting me a different batch of people to do all of it. That's all I know about concrete.
    Had my shop poured last January. I hired a guy to complete the excavation and another to pour the concrete. These were two local, small town, contractors who work together often and were recommended by the builder.

    The excavation involved adding and finish compacting 3/4" minus on top of the 1 1/2" I had previously added directly after the build in October. The pour included a 5+ inches of concrete with steel grid, and a short distance pumper.

    This was my one and only experience with concrete work. It came out great, very happy with the job.

    Click image for larger version. 

Name:	IMG_3570.JPG 
Views:	23 
Size:	622.4 KB 
ID:	481994

    Click image for larger version. 

Name:	IMG_3573.JPG 
Views:	24 
Size:	605.5 KB 
ID:	482002
    etcallhome, MDrew, Levi and 7 others like this.
    Marlin

    JD 1026R - March/2013
    JD H120 NSL Loader, JD 647 Tiller, JD Ballast Box
    Frontier BB2048L Box Scraper
    IMatch, Piranha Tooth Bar
    Ken's Bolt-On Hooks & FEL Receiver Hitch
    John Deere Wheel & Suitcase Weights
    Wheel Spacers - 2" Front, 4" Rear
    Heavy Hitch Hitch’N Can
    LED Lights Front & Rear Facing
    Artillian Forks & Front Hoe
    R4 Tires Front & Rear


    
"Prayer can never be in excess." ~ C. H. Spurgeon




  12. Top | #10

    Join Date
    Feb 2017
    Last Online
    09-09-2019 @ 07:46 AM
    Location
    Prince William County, VA
    Posts
    195
    Thanks
    27
    Thanked 9 Times in 7 Posts

    Thanks again

    That's a great space, Marlin. How effective are those heaters I see up near the rafters? Heat is one of the things I'm going to have to decide on.

    Levi, the builder will do all the work with regard to the concrete, including leveling the stone. They just won't buy the stone and have it in place.
    MDrew, Levi, BigJim55 and 3 others like this.

  13. Remove Advertisements
    GreenTractorTalk.com
    Advertisements
     

Page 1 of 7 1 2 3 ... LastLast

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •