Green Tractor Talk banner
1 - 1 of 1 Posts

·
Registered
Joined
·
2,652 Posts
Nice.

We do that with Excavators. Move the excavator near pipe or conduit. Swing boom over one track, push dipper down to elevate the one track. Wrap mule tape or p-line around track about 2-3 times, then move track stick, to get the one track spinning. Easy in the field capstan.
One outfit I worked for had a capstan that bolted into 3 lugs, on a Case 580 wheel. Same thing you did for the most part, put the outrigger down and wrap it around and pull product in, or out.
 
  • Like
Reactions: Zebrafive
1 - 1 of 1 Posts
This is an older thread, you may not receive a response, and could be reviving an old thread. Please consider creating a new thread.
Top