Thinking of getting the hoe and can't decide which bucket to get. For some of the trenching I want to do the 9" would be fine, but I also have stumps to dig (nothing real big) and wondering how the 16" would do, or if I should just get a 12" and use it for everything. If I need to dig a big hole or a footer for a foundation it will just take longer and give me more seat time!
Thinking of getting the hoe and can't decide which bucket to get. For some of the trenching I want to do the 9" would be fine, but I also have stumps to dig (nothing real big) and wondering how the 16" would do, or if I should just get a 12" and use it for everything. If I need to dig a big hole or a footer for a foundation it will just take longer and give me more seat time!