I'm finally getting around to finishing my downstairs/basement. Drywall is complete and they are painting Monday. Carpet is already ordered, just need to give them a firm date for install.
So do I wait for carpet to be installed or do I install the baseboard trim first? The concrete floors are somewhat even but are not perfect. Also would you snap a chalk line for level or use a shim off the floor?
Thanks for your input as this is the first time I've ever ventured into trim work:flag_of_truce:
So do I wait for carpet to be installed or do I install the baseboard trim first? The concrete floors are somewhat even but are not perfect. Also would you snap a chalk line for level or use a shim off the floor?
Thanks for your input as this is the first time I've ever ventured into trim work:flag_of_truce: