Green Tractor Talk banner

1 - 7 of 7 Posts

·
Registered
Joined
·
93 Posts
Discussion Starter #1
This has been something I wanted to do for some time. When I had the 3rd scv installed I also had the power beyond loop added. Having read numerous threads about this and getting a lot of help from these forums I now have two more working scvs on my tractor. I copied Cocre's design and with the help of my neighbor, i commissioned a local welder for the mounting bracket, got the stack valves from surplus center, the hoses and fittings from a local hydraulic shop and the couplers from my local jd dealer. In the near term I want to add a second hydraulic cylinder to my rear blade for side to side angle. Will also be looking into a hydraulic tilt cylinder to complement my toplink.

-Dana







 

·
Administrator
Joined
·
18,276 Posts
Nice job Dana, Thanks for posting:thumbup1gif:
 

·
Registered
Joined
·
280 Posts
nice job!!!
 

·
Premium Member
Joined
·
6,593 Posts
Well Done Dana!

:good2::thumbup1gif::good2::thumbup1gif:
 

·
Registered
Joined
·
93 Posts
Discussion Starter #5
Thank you! I am excited to have completed something like this. A big step for me. Sadly only a year ago something as straight forward as this was out of my capability! Baby steps. Will post the completed blade.
-Dana
 

·
Senior GTT Super Slacker
Joined
·
37,773 Posts
I guess it's nice. Can't really tell, the pictures leave a bit to be desired.
 

·
Registered
Joined
·
93 Posts
Discussion Starter #7
I apologize for the lousy pictures- maybe these will work better...
 

Attachments

1 - 7 of 7 Posts
Top