Green Tractor Talk banner

1 - 5 of 5 Posts

·
Registered
Joined
·
121 Posts
Discussion Starter #1
Thought I would share tonight's diggin story. I had a mesquite tree in hard pack. Took me 2.5 hrs to remove and fill in the bunker. The hole ended up about 8 ft round and about 4 ft deep. I could have lost the 1025R in there if I wasn't careful :thumbup1gif:

I have about 80 of my 140 hrs diggin stumps out, so I have had a fair amount of practice. All of them mesquites. If you have ever dug one of these out they are some of the worst. Lots of roots and they can go deep. So far I haven't found one yet that I couldn't get out.

My first stump took me about 10 hrs to remove as compared to this one at 2.5 hrs. Both stumps were about the same size. It's just the practice that has taught me how best to remove these. I run about 2200 rpm's when I dig now. I find I get a little boost of power above 2000 and the faster controls are to my liking.

IMG_1124.jpg
IMG_1134.jpg

The Stump Field. Here are some of the stumps I have dug out in the last year.
IMG_1136.jpg
 

·
Premium Member
Joined
·
1,130 Posts
:thumbup1gif::thumbup1gif::thumbup1gif::thumbup1gif:
 

·
Registered
Joined
·
1,106 Posts
Nice job! man those roots dig in don't they?
 

·
Bonehead Club Lackey
Joined
·
10,269 Posts
Wow! You have been busy. Great job! :bigthumb: Safe to say your BH isn't sitting in some corner somewhere.
 
1 - 5 of 5 Posts
Top