Finished up my BB. Put one 3" pipe and one 4" pipe and filled with gravel. I also notched out the bottoms of both pipes so water could drain out.
I have two ten foot chains in the 4" and they just fit.
I then put together a cart so I could move the box out f the way. I think I could use better wheels cause that baby is heavy.
I have two ten foot chains in the 4" and they just fit.
I then put together a cart so I could move the box out f the way. I think I could use better wheels cause that baby is heavy.



